Technical articles — AMS · NADCAP · Processes — Case studies
Technical
Blog
Technical articles — AMS · NADCAP · Processes — Case studies
Kronos Engineering technical blog: special process guides (shot peening, cold working, HFMI, flapper peening), AMS / NADCAP / IIW 2016 standards analysis, field reports, aerospace, nuclear and offshore case studies.
Complete checklist to objectively audit your peening installations regardless of manufacturer. 40 critical points, with no commerc
MULTI BRANDObjective comparison shot peening vs HFMI for welded joint improvement: efficiency, productivity, recommended applications, test d
HFMIHFMI on offshore wind turbine mast and jacket welds: severe environment (corrosion + fatigue), IIW 2016, DNV-GL, offshore operatio
MULTI BRANDNeutral comparison of peening technologies: conventional shot peening, flapper, roto, needle, ultrasonic, laser. Selection matrix
NADCAPComplete methodology to prepare for a NADCAP Heat Treatment audit (shot peening): 30-point checklist, documentation, interviews, f
SHOT PEENINGShot peening on Inconel 718 superalloy: high intensity, conditioned steel media, roughness control, AMS 2432 compliance and GE/Saf
SHOT PEENINGShot peening on aerospace titanium alloys (Ti-6Al-4V, Ti-17): process parameters, intensity, coverage, residual roughness, contrai
AOGKronos Engineering AOG protocol decoded: on-call rotation, technical qualification, team commitment, tool mobilization, 24h interv
FLAPPER PEENINGFlapper peening on aircraft in line maintenance: access areas, AOG protocol, portable tooling, AMS 2432 compliance in field operat
HFMINeutral comparison PIT (pneumatic) vs UIT (ultrasonic) vs HiFIT for HFMI: productivity, quality, cost, accessibility. No commercia
HFMIIIW 2016 recommendations for HFMI (High Frequency Mechanical Impact): process parameters, quality control, fatigue life improvemen
COLD WORKINGObjective comparison Split Sleeve vs Split Mandrel: precision, productivity, surface quality, operational cost. Use case recommend
COLD WORKINGBACC 5060 guide: cold expansion of fastener holes. Principle, split sleeve/mandrel equipment, deformation control, 3× to 10× fatig
SHOT PEENING200% Peening coverage is becoming the OEM standard. Understanding its theoretical justification, measurement methods (visual, Peen
SHOT PEENINGComplete breakdown of AMS 2430 (automatic shot peening): requirements, controls, pitfalls, required documentation and NADCAP audit
SHOT PEENINGComplete understanding of Almen intensity: N/A/C strips, arc height, saturation, AMS 2430 compliance, process control and operatio
support?